13/6/17
On this date, we went through and had to print out a lot more photos for the walls as we wanted to print them off in different sizes and other attributes like black and white. We placed these on the walls and then proceeded to work on the more aesthetic qualities like the flooring which changed to show the change in time and age. This is also representative with the clocks that i am using.
After all of this we had to place a black sheet on the wall for the projector as the originally concept that we wanted for the project is hard to do as we wanted to place it above the bed facing down on to it. We have now decided to place it on the bed at the wall where the black square is to put the projection on.
After all of this we had to place a black sheet on the wall for the projector as the originally concept that we wanted for the project is hard to do as we wanted to place it above the bed facing down on to it. We have now decided to place it on the bed at the wall where the black square is to put the projection on.
Comments
Post a Comment